Advanced pump system upgrade cuts AlburyCity Council costs
Supplied by ABB Australia Pty Ltd on Tuesday, 16 March, 2021
AlburyCity Council in NSW operates two water supply systems to manage and treat raw water to provide clear, drinkable water. A thorough analysis of their system was undertaken to identify electrical disturbance issues and inefficiencies in the existing pumping system.
Learn about a drive and motor innovation adopted by AlburyCity that has maximised energy efficiency and prevented residential disturbances caused by power quality issues.
Boosting production: success story of a leading soft drink manufacturer
Discover how to boost your plant’s efficiency,...
The Willunga Basin Pipeline - a triple bottom line role model
The Willunga Basin Pipeline in South Australia is a large reclaimed water scheme which is...
Precise measurement key to biogas meeting its green promise
Biogas produces clean, green electricity capable of helping reduce global CO2 and methane...