Advanced pump system upgrade cuts AlburyCity Council costs

Supplied by ABB Australia Pty Ltd on Tuesday, 16 March, 2021


AlburyCity Council in NSW operates two water supply systems to manage and treat raw water to provide clear, drinkable water. A thorough analysis of their system was undertaken to identify electrical disturbance issues and inefficiencies in the existing pumping system.

Learn about a drive and motor innovation adopted by AlburyCity that has maximised energy efficiency and prevented residential disturbances caused by power quality issues.


Related White Papers

Advanced control of critical water infrastructure — a case study

Learn about next-level industrial radio technology that has optimised the workings of a...

How to optimise DC energy consumption with UPS eco-mode

Using the "eco-mode" option on UPS systems provides a proven 2% reduction in data centre...

Next-gen monitoring cuts farmer energy costs by 50% — a case study

Learn how WaterForce implemented an integrated automation and information management...


  • All content Copyright © 2022 Westwick-Farrow Pty Ltd