Rockwell drives down energy costs
03 April, 2005 | Supplied by: Rockwell Automation Australia
Rockwell Automation Australia has been commissioned to install an induced draft (ID) fan upgrade at the BlueScope Steel, Port Kembla steelworks plant. Installed in December 2004, the entire upgrade is scheduled to be completed by June 2005
Water in the semiconductor industry
03 April, 2005 | Supplied by: Philips Components Pty Ltd
Philips Semiconductors Philippines in Cabuyao Laguna has developed a system to recycle final rinse water used in its polishers. To do this, the facility operates two systems - one is on standby while the other is in service
