Rockwell drives down energy costs
03 April, 2005Rockwell Automation Australia has been commissioned to install an induced draft (ID) fan upgrade at the BlueScope Steel, Port Kembla steelworks plant. Installed in December 2004, the entire upgrade is scheduled to be completed by June 2005

